TECH · TechnologyBuilderHub-R · Exposed column bases

The geometry moved to BIM. The rebar check stayed on paper.

On a column base manufacturer's document list, two items sit side by side: BIM data for the column base, and a rebar-study line drawing. The shape went 3D. Checking how that shape meets the rebar did not.

Published August 4, 2026·Last checked · August 2026

Key points

  • Manufacturer documentation splits the problem: geometry as BIM data, rebar study as a 2D drawing
  • Model a shape as tangled as an exposed column base for real and the clash check moves from 2D to 3D
  • BuilderHub-R has the column base product data built in — pick a designation and start modelling, with nothing else to enter

1What the manufacturer's own document list shows

Line up what a column base manufacturer publishes and you can see it plainly. An installation manual, certificates, standard details, column base drawings. And BIM data for the column base. On the same list, there is also a rebar-study line drawing — on paper.

The shape went 3D. Checking how that shape meets the rebar did not.

An exposed column base with rebar placed automatically
An exposed column base with rebar placed automatically by BuilderHub-R (BASE PACK, 16-bolt type). Anchor bolts, anchor frame, top and bottom bars of the footing, foundation beam bars and column ties — all within a few dozen centimetres.

2It fits on the drawing

Anchor bolts, anchor frames, the top and bottom bars of the footing, the main bars of the foundation beam, the column ties. On the drawing, that congested volume resolves cleanly. On site, it doesn't — and someone decides on the spot.

Until now, clashes around a column base could only be checked in two dimensions: a section drawing laid over a rebar-study drawing, a handful of cuts standing in for the whole joint. Whatever happens between those cuts, you don't see.

Column base hardware isolated
Base plate, anchor bolts, anchor frame. This is what the rebar actually collides with.

3The catalogue drawing, turned into geometry

The catalogue drawing next to the BuilderHub-R model
Left: the manufacturer's column base overview drawing. Right: the same base built in BuilderHub-R. Upper and lower templates, frame posts, all sixteen anchor bolts — the positioning hardware is there too.

The anchor frame disappears the moment the concrete is poured. It is still the part that decides whether the rebar fits: the height the templates occupy, where the posts stand. Simplify it into a box and you delete exactly the thing the clash check depends on.

4Why the geometry has to be real

Model a shape as tangled as an exposed column base for real, and the clash check itself becomes three-dimensional. Holding it as true geometry rather than a symbol changes five things.

  • The check moves from 2D to 3D You look at the whole joint, not at representative cuts.
  • A clash reads as “short by this many millimetres” The lower frame and posts of an anchor cage are lines on a study drawing, but in reality they occupy the height the footing bars need to pass through.
  • You can answer whether the pedestal bars thread between the anchor bolts — a question that only exists once the bolts have a real diameter and pitch and the ties have a real bend radius.
  • Rebar and quantities come from the same model The concrete deduction around the base and the bar lengths stop being two separate inputs.
  • The build sequence becomes visible The anchor frame goes up before the rebar, so “the bar won't go in later” is something you find before work starts.

5Pick the designation, and you can start modelling

Exposed column base manager
The column base manager. Choose a designation from the built-in product data and the anchor bolt count, thread size, base plate dimensions and thickness are set. On the right are the RC pedestal settings; only the make-up of those fields is withheld.

BuilderHub-R ships with the data for the exposed column base products used across Japan built in. Select a product designation and the details — anchor bolt count, base plate thickness — are set for you, so you can start modelling straight away, with nothing else to enter.

The screen does more than show product specifications. The RC pedestal around the base is configured here too. Those are the fields running down the right-hand side; we've withheld how they're composed. What they do is simple enough to say plainly — one product designation settles the rebar conditions for the pedestal as well.

Once the model exists, you can check clashes against the surrounding rebar live, in 3D — cutting review time and catching the problem before anyone breaks ground.

Some of those settings used to mean digging through drawings. The cover below the column base, for one: BuilderHub-R finds the connecting members and computes it automatically. The RC rebar around the base is handled along with it.

And when a clash does turn up, you fix it where you found it. Run the rebar clash check on just the members you selected, then edit anchorage length and type, laps, or the bar nodes themselves until it resolves. Finding and fixing aren't separate places.

What engineers were really deciding was never the placement of a bar. It was the setting: laps, anchorage, cover.

Column bases aren't the only case. The same release builds in the geometry and data for proprietary beam sleeve reinforcement (MAX Webren, Diaren NS, Super Hari Z). Handle the products the site actually uses, as products — that is the consistent idea behind this direction.
Coverage — of the four exposed column base methods most used in Japan, BASE PACK and NC Base are supported, shipping 14 August 2026 in ver 26.3.0. HiBase NEO and Smart Base will follow. A video of the actual workflow is coming.
Based on publicly available vendor documentation reviewed in August 2026, we found no product documenting this workflow. Method and product names are trademarks of their respective owners.

This article is a summary compiled from published material. It is not a legal interpretation and does not constitute advice. Regulation changes frequently, so please check the original documents and the latest notices from the responsible authority before relying on it in practice.