ChangSoft Global ChangSoft Global
BIM 258-SBIM 258-S

BIM 258-S · Kết cấu

The BIM mandate, answered with one tool.

Vietnam now requires BIM on every new building of Grade 2 and above. BIM 258-S covers the first discipline the mandate names — main structures. It reads 2D drawings, builds the structural model automatically, and takes the quantities off that model. The product widens in the order the regulation widens.

BIM MANDATE · BIM 258-S + S-BOX
Grade 2+
Any new building, regardless of funding source
8 floors · 28 m · 10,000 ㎡
Crossing any one of six criteria makes it Grade 2
LOD 300
The precision quantity takeoff needs. Drawing-based, so dimensions are exact
Why now

Three documents define the requirement

Since 1 July 2026 the Construction Law, its decree, and the grading circular have all come into force in new versions. BIM 258-S was built to answer exactly what these three require.

NGHỊ ĐỊNH 217/2026/NĐ-CP

Who, when, what

New Grade 2 and above buildings apply BIM from the feasibility stage. Submission in open formats such as IFC. The model must carry location, three-dimensional geometry, and the principal dimensions of main members.

QUYẾT ĐỊNH 258/QĐ-TTg

Which disciplines

The document that enumerates disciplines in the minimum requirements for a BIM file — the three-dimensional geometry of main structures, and pipework. Structure comes first.

THÔNG TƯ 34/2026/TT-BXD

Is my building in scope

Over 28 m tall · 8 storeys or more · over 10,000 ㎡ · span of 50 m or more · 6 m or two levels below grade — crossing any one of the six makes it Grade 2.

Why 258

The product name is the governing document

The decree does not divide BIM by discipline. It only says "main members". The single document that enumerates disciplines is QĐ 258/QĐ-TTg — the three-dimensional geometry of main structures, and HVAC, ventilation and plumbing pipework.

So we split the product the way the law splits it, and took the name from that document. 258-S is the first discipline, 258-M the second, BIM 258 both.

The number is not decoration. When the governing document is revised, we raise both the number and the product specification.

Quyết định 258/QĐ-TTg — minimum requirements for a BIM file

  • BIM 258-SKết cấu chínhMain structures
  • BIM 258-MHệ thống đường ốngPipework
  • BIM 258Cả haiStructure + MEP + clash detection
Our approach

In the order the regulation extends

Vietnam's BIM regime is not completed in one step; it widens in stages. We follow that order — starting with the main structures the law names first, then IFC submission, then the statutory takeoff forms, then MEP and clash detection.

  1. Now

    3D geometry of main structures

    The discipline QĐ 258 lists first. You get the structural model and the quantities.

  2. Now

    IFC submission

    The open format NĐ 217 requires. Connects to the submission process.

  3. Now

    Statutory takeoff forms

    BẢNG 6.1 and 6.2 of TT 13 Annex VI, as they are. Re-typing disappears.

  4. After that

    MEP · clash detection

    The second discipline in QĐ 258, and the clash detection NĐ 217 names as a review item.

How it works

Drawings in, structure standing

It reads structural schedules and plans to recognize members, builds the 3D structure, takes off concrete and formwork quantities, and exports IFC. All inside one program.

BIM 258-S feature video · Narration and captions in Vietnamese, the language of the software UI
01

Structural schedule recognition

Member names and section dimensions are read as text from column, beam and wall schedules, and the member list is generated automatically. Typing them in one by one goes away.

Nhận dạng bảng cấu kiện

02

Plan recognition → automatic modeling

Select the wall and slab layers in the drawing and the members are recognized and the 3D structure is built. The member list for columns, walls, beams, slabs, footings and piles is produced in the same pass.

Tự động mô hình hóa từ nhận dạng bản vẽ mặt bằng

03

Quantity takeoff — the basis is visible

Concrete and formwork quantities are computed from the model. Click a row in the takeoff table and that member is highlighted in 3D. Where a number came from can be seen, not assumed.

Bảng bóc tách khối lượng

04

IFC export — the NĐ 217 submission format

The model is exported to IFC2x3 or IFC4, and can be split by floor. The basis of each quantity travels with it as IFC properties. The 3D structure opens as it is in other vendors' IFC viewers.

Xuất IFC

What you get

What you get today

We state where the product actually is. The takeoff scope is concrete and formwork; MEP (258-M) and clash detection are on the roadmap.

ModelAvailable now

3D structural model

Footings · columns · beams · slabs · walls · stairs. Built from drawing recognition, so dimensions and positions are accurate.

QuantityAvailable now

Concrete · formwork quantities

Takeoff by member and by floor, with the basis inspectable. Exported to Excel. The takeoff scope is concrete and formwork.

ExportAvailable now

IFC export

IFC with member classification, properties and quantities intact. Connects to submission systems and collaboration tools.

ReportAvailable now

Vietnamese statutory takeoff forms

Output in the BẢNG 6.1 and 6.2 formats as they are. Re-typing disappears.

The forms come out as forms. BIM 258-S outputs the detail and summary tables of TT 13/2021/TT-BXD Annex VI in those formats, and states that the quantities were determined by software.

S-Box · free beta

Check the data in S-Box before you submit

At its BIM appraisal seminar on 24 October 2026, Vietnam's Ministry of Construction stressed that BIM data must match the drawings and the quantity tables, and that data quality should be self-checked before submission. S-Box is the web service that takes BIM 258-S output and does that cross-checking and record-keeping.

Issue raised at the seminarWhat S-Box does
BIM does not match drawings or quantity tablesCompares the 2D takeoff with BIM quantities by member group and by floor range, and points to the groups with large gaps.
Version mismatch · unclear sourceCompares design revisions automatically and records the reason for each revision.
Inaccurate or missing member dataMarks added, changed and deleted members by color in the table and in the 3D model.
Self-check before submissionChecks nine items automatically — file, version, missing data, classification and more — and produces a Word or PDF report.

Design revision comparison — what changed, where and by how much

S-Box compares each revision by floor, member and ID. Click a row in the table and the member is highlighted in the 3D model; the reason for each revision is recorded too.

About 1 minute · Vietnamese narration and captions · demo sample Tòa D (mẫu)

Is BIM mandatory here? — Construction grade check

Enter outline figures such as floors, floor area and height. S-Box determines the construction grade under Circular 34/2026/TT-BXD and whether BIM is mandatory under Decree 217/2026/NĐ-CP. No file, no login.

Pre-submission self-check report

Nine items are checked automatically and marked pass or needs review; members that need review are listed with ID and floor. Save it as Word or PDF and attach it to the submission.

Structural DB insight — for contractors

Compares this project's quantity per ㎡ with your own past projects of the same use and structure, showing where it sits in the distribution and which member group deviates most. The more projects, the better the estimating baseline.

About 30 seconds each · Vietnamese narration and captions · demo data

Design revision comparison — added (green), changed (orange) and deleted (red) members shown in 3D. Demo sample Tòa D (mẫu)
Design revision comparison — added (green), changed (orange) and deleted (red) members shown in 3D. Demo sample Tòa D (mẫu)
2D takeoff vs BIM — floor-range comparison. Finds gaps by floor range even when the totals look close
2D takeoff vs BIM — floor-range comparison. Finds gaps by floor range even when the totals look close

S-Box helps check and explain the data; it does not replace the appraisal. Data is visible only to your company's account, and original files are not uploaded.

Open the S-Box demo
Pricing

Less than one month of one modeler

BIM 258-S

Structural modeling and quantity takeoff.

v01 · available now

+ IFC

IFC2x3 · IFC4 export.

Included · available now

+ Statutory forms

BẢNG 6.1 · 6.2 takeoff output.

Included · available now

IFC export and the statutory takeoff forms are included in BIM 258-S. S-Box can be used alongside it free of charge during the beta.

Ask for pricing
Product line

Split the way the law splits it

QĐ 258 enumerates main structures and pipework as separate disciplines in the minimum requirements for a BIM file. The product line follows that split — which is why it is called 258.

ProductCoversIncludesPer year
BIM 258-SStructureStructural model · quantities · statutory forms · IFCContact us
BIM 258-MMEP (HVAC · ventilation · plumbing)MEP model · IFCRoadmap
BIM 258Structure + MEPAll modules + clash detectionRoadmap
The documents

What the citations on this page mean

Vietnamese legal documents are conventionally called by abbreviation. Here is what the abbreviations used on this page stand for.

Cited asFull titleWhat it governs
QĐ 258Quyết định 258/QĐ-TTg17 Mar 2023 · Prime Minister's DecisionThe BIM adoption roadmap. The only document that enumerates disciplines in the minimum requirements for a BIM file — 3D geometry of main structures / HVAC, ventilation and plumbing pipework
NĐ 217Nghị định 217/2026/NĐ-CPIn force 1 Jul 2026 · DecreeWho submits what and when. Mandatory for new Grade 2 and above, submission in open formats such as IFC, clash detection and metric extraction used in review. Replaces NĐ 175/2024
TT 13 Annex VIThông tư 13/2021/TT-BXD, Phụ lục VIMinistry of Construction circularQuantity takeoff method and forms. Sets the takeoff rules and deduction criteria for concrete, formwork and reinforcement
BẢNG 6.1 · 6.2Bảng tổng hợp / Bảng chi tiết khối lượng xây dựngForms defined by that annexThe two statutory takeoff forms — 6.1 the summary table (by work item) and 6.2 the detail table (by member)
TT 34Thông tư 34/2026/TT-BXDIn force 1 Jul 2026Works grading criteria. Determines Grade 2 by six measures: height, storeys, floor area, span and depth below grade
LODMức độ phát triển thông tinMinistry of Construction BIM guidanceLevel of development of model information. The guidance defines 100–400 and states that quantity takeoff requires LOD 300